I thought I would start with this rather scary picture of one of the Aoraki workforce on the scaffolding, taken from their website. Those people must have nerves of steel! It is also indicative of the fact that there are workers all over the building right now, accompanied by a lot of noisy activity, as every level has something important going on. For the first time, it is possible to be vividly aware that there are over fifty of them.
Scaffolding
It has been promised since back in December that the scaffolding would start to come down soon, but after a start the operation was stalled by (a) the holidays and (b) the weather. Spring has not lived up to its promise. But, hopefully, more will happen next week.
As Beckie (of the bulletins) communicated to me, the removal will be of the top five-six floors, starting on the western side, and moving all around the building. The scaffolding about the hoist will be the last to go. As she wrote:
'It is all elevations except the part on the South elevation where our construction hoist is; but starting on the West elevation next week, then we will make our way around. The actual process will take 2-3 weeks and is weather dependant (but you should see some activity happening from next week).'
Ventilation upgrade
The fans are being adjusted all the time, as the movement down the building allows. Those on the top floors will have noticed that the noise has quietened considerably, which is a very good sign.
The Board
We had the first meeting of the new board on Monday, and a lot was discussed and decided. Chris Garrett is now officially the chairman, and Camille Dentice is the deputy. Congratulations and good luck to them both. We have just five directors now, which is a bare quorum. Any volunteers putting up their hands to come onto the board would be most welcome. We also need alternative directors, people who will step in on a temporary basis when a director is sick or away from Wellington, just to make sure we have a quorum. Again, anyone interested would find a welcome.
The lifts
You would have noticed that the veneer has been taken away from around the lift thresholds. This is in preparation for some strengthening, ready for the new doors. Aoraki Construction is now waiting for plans from Otis for the next step, which is adjustment of the jambs -- the vertical sides of the thresholds -- plus strengthening of the lift shaft. There are also ongoing talks with Spectrum.
Sky
The cables to the aerials, which ran down the ventilation risers, have been cut, and there will be no antennae on the roof. Conversation with Sky is ongoing, and meantime the only fix is Sky pods and wifi. Unfortunately it means that programmes can't be recorded to be played later.