Meetings:
There was yet another meeting at TBIG on
Wednesday afternoon, following the Board meeting on Tuesday night. The major topic was how asbestos-containing
ceilings will be handled, with a number of options that were discussed in
detail. This is part of getting ready for the foyer meeting on Monday 18th,
at 6pm. There is a lot to be discussed,
and I am certain there will be many questions to be answered. We need to
collect all the information possible, as time is getting short. The AGM is on 9 December, remember, part of
the pre-Christmas rush. All shareholders
will have papers to study about two weeks before that. And please be ready to fill in a proxy form
if you are not able to be present.
Moving in and out of your apartment:
There will be a timetable for this, which
Aoraki and TBIG are working on. A significant number of apartments will have to
be completely emptied, and so Damien has been negotiating with a number of
moving companies. Other apartments will have to have the furniture taken out of
rooms that are being worked on, and stored in other rooms. The movers could do this too, or individual
residents could manage it themselves.
What is going to make it easier is that
Aoraki have offered the use of their hoist to get furniture in and out of the
building, which will save the pressure on our poor old elevators.
This hoist will be set up at the bottom of
the steps by the back door, where the spare bins are stacked now. It will lead
up to the window in the third bedroom of the B apartments, which has to be
taken out and replaced by a fire spandrel, plus a new window and a panel. Not
only is this part of getting the fire rating of the building up to code, but while that part of the wall is open it
forms a handy access to the inside of the building for the workmen and their
materials.
| Image supplied by Marc Woodbury of Studio Pacific |
The website is https://www.govt.nz/browse/housing-and-property/insulation-and-energy-efficiency/paying-for-home-insulation/


No comments:
Post a Comment